Breaking News :

THIRD MAINLAND BRIDGE: LASG TO SHUT BRIDGE FOR 24HOURS FOR REMOVAL OF EQUIPMENT USED DURING THE REHABILITATION WORKS

Having completed the replacement of the 12th expansion joint and to demobilize the superstructure of the Third Mainland Bridge, the Lagos State Government will shut down the Bridge from midnight Friday, 26th to midnight Saturday, 27th February, 2021.

The Commissioner for Transportation, Dr. Frederic Oladeinde stated that the total closure of the bridge was slated to enable the contractors move the equipment used during the rehabilitation process off the bridge completely to allow both the Oworonshoki and Adeniji bound lanes open fully to traffic.

The Commissioner, therefore, advised Motorists from Ogudu, Alapere and Gbagada to use Ikorodu Road, Jibowu and Yaba as alternative routes, while Iyana Oworoshoki-bound traffic from Lagos-Island, Iddo, Oyingbo, Adekunle and Yaba are enjoined to use Herbert Macaulay Way, Jibowu and Ikorodu Road as alternative routes.

Oladeinde assured that Traffic Management Personnel would be deployed along the affected routes to minimize and address any traffic impediments during the closure.

Commending Lagosians for their cooperation during the prolonged repair works of the Bridge, the Commissioner assured that the bridge is now safe for use by all and sundry.

Dr. Frederic Oladeinde

Honourable Commissioner for Transportation.

Prince Chukwudi Timothy Samuel

Prince Chukwudi Timothy Samuel is the Chairman / CEO, MicMiraSteph Communications and Chief Media Director, Apex Reporters

Read Previous

WHY DID WAEC WITHHOLD 70,000 RESULT OVER DEBT IN KANO STATE.

Read Next

SAVE IMO STATE FROM THIS TWO POLITICAL THUGS

Leave a Reply

Your email address will not be published. Required fields are marked *

Most Popular

Show Buttons
Hide Buttons